ROADS AND INFRASTRUCTURE
industrial road
Construction and rehabilitation of a connecting route in the Mutare industrial area.
TEMPORARY SOURCE IMAGE - HIGH-RESOLUTION ORIGINAL REQUIRED
LOCATION
Mutare, Zimbabwe
CATEGORY
Roads and infrastructure
MEASUREMENT
425 m
CLIENT
City of Mutare
EVIDENCE
Contract COM/ERRP2B01/2025
Project summary
Huldreich Contractors was sub-contracted by The Gap Company to resurface 8,000 m² of road and car park at Zimbabwe House.
CONFIRMED SCOPE
- Pothole patching
- Hot asphalt overlay
- Kerbstone construction and painting
- Road markings and painting
SUPPORTED MEASUREMENT
8,000 m²
RELATED CAPABILITY
Road rehabilitation
EVIDENCE
Reference letter, The Gap (Pvt) Ltd, 29 April 2025
LOCATION
CONFIRMATION REQUIRED


MATERIAL DETAIL
Hot asphalt overlay over patched pavement, with kerbstone construction and line marking to complete the surface.
CONCEPTUAL IMAGES — APPROVAL OR REPLACEMENT REQUIRED
Project gallery
9 IMAGES · USE ARROW KEYS TO MOVE BETWEEN IMAGES

Asphalt paver and finishing crew during surfacing works.
TEMPORARY SOURCE IMAGE — HIGH-RESOLUTION ORIGINAL REQUIRED