Construction and rehabilitation of a connecting route in the Mutare industrial area.

TEMPORARY SOURCE IMAGE - HIGH-RESOLUTION ORIGINAL REQUIRED
LOCATION

Mutare, Zimbabwe

CATEGORY

Roads and infrastructure

MEASUREMENT

425 m

CLIENT

City of Mutare

EVIDENCE

Contract COM/ERRP2B01/2025

Project summary

Huldreich Contractors was sub-contracted by The Gap Company to resurface 8,000 m² of road and car park at Zimbabwe House.

CONFIRMED SCOPE
  • Pothole patching
  • Hot asphalt overlay
  • Kerbstone construction and painting
  • Road markings and painting

SUPPORTED MEASUREMENT

8,000 m²

RELATED CAPABILITY

Road rehabilitation

EVIDENCE

Reference letter, The Gap (Pvt) Ltd, 29 April 2025

LOCATION

CONFIRMATION REQUIRED

Discuss a Similar Project
Asphalt road
Kerbstone detail
MATERIAL DETAIL

Hot asphalt overlay over patched pavement, with kerbstone construction and line marking to complete the surface.

CONCEPTUAL IMAGES — APPROVAL OR REPLACEMENT REQUIRED

Project gallery

9 IMAGES · USE ARROW KEYS TO MOVE BETWEEN IMAGES
Asphalt paver

Asphalt paver and finishing crew during surfacing works.

TEMPORARY SOURCE IMAGE — HIGH-RESOLUTION ORIGINAL REQUIRED

Compaction

Compaction of the finished surface.

Material haulage

Material haulage to the working face.